product banner
 GB 75kg/m heavy duty  rail
 GB 75kg/m heavy duty  rail
 GB 75kg/m heavy duty  rail
 GB 75kg/m heavy duty  rail
 GB 75kg/m heavy duty  rail
 GB 75kg/m heavy duty  rail
 GB 75kg/m heavy duty  rail
 GB 75kg/m heavy duty  rail
GB 75kg/m heavy duty rail
75kg/m heavy rail is mainly used in railway transportation lines with high requirements for track bearing capacity and impact resistance, such as busy trunk railways, heavy-load railways, and turnout areas of high-speed railways.
Inquiry Now
  • 请在浏览器中启用JavaScript来完成此表单。
    0 of 200 max characters.
  • Product Introduction

    75kg/m heavy rail specifications
    Rail height 192mm
    Head width 75mm
    Bottom width 150mm
    Waist thickness 20mm

    Impact-resistant GB standard 75kg/m heavy rail is a heavy rail specially used for railway tracks and can withstand large impact loads. When the train starts, brakes, accelerates or passes through special sections such as turnouts, it will generate a large impact force on the heavy rail. The heavy rail needs to have excellent impact resistance and be able to withstand these instantaneous strong impact forces without cracking or permanent deformation, ensuring the stability of the track structure and the safety of train operation.

    Product Specifications

    Rail Type SIZE(mm)
    Section height Bottom width Rail head width
    Heavy rail 75KG 192mm 150mm 75mm

    Product Application

    Mainly used in heavy-duty railways, high-speed railways and some railway lines that have high requirements for track bearing capacity and impact resistance. In heavy-duty railways, such as the Daqin Railway, 75kg/m heavy rails can withstand the huge load of trains and ensure the reliability of the tracks under long-term heavy loads.

    Product Packaging and Delivery

    FAQ

    Q:About product prices?
    A:Prices vary from period to period due to cyclical changes in the price of raw materials.

    Q:What are the certifications for your products?
    A:We have ISO 9001,EWC and other certifications.

    Q:How long does your delivery time take?
    A:In general, our delivery time is within 7-45 days, and may be delayed if the demand isextremely large or special circumstances occur.

    Q:Can I go to your factory to visit?
    A:Of course, we welcome customers from all over the world to visit our factory.

    Q:Does the product have quality inspection before loading?
    A:Of course, all our products are strictly tested for quality before packaging.

  • 请在浏览器中启用JavaScript来完成此表单。
    0 of 200 max characters.